What Long Beach lets you build without a building permit
The city's "Do I need a permit?" page and its fences and walls page set these limits. Any fence under 4 ft needs no permit. Wood, chain link and wrought iron fences need none up to 6 ft 6 in, and concrete or masonry walls none up to 4 ft. Unroofed decks up to 30 in above grade and retaining walls up to 4 ft (with no surcharge or sloping earth behind them, and not on a slope steeper than 1 in 5) are exempt. Patio covers are not: the city says they need a permit.
No permit does not mean no review. The Planning Bureau approves the location, height and material of every fence and wall. A wall on a shared property line needs the Common Property Line Wall Fence Agreement, signed by each owner and notarized. Lights or an automatic gate can add an electrical permit.
- Fence over 6 ft 6 in or wall over 4 ft: engineering drawings or installation instructions for residential work
- Reroofing: the page lists both a 100 and a 500 square foot exemption, so confirm with the Permit Center before you skip a permit
- Permit Center: 411 W. Ocean Blvd., 562.570.PMIT (7648)



