Who to call and how permits are filed
The city's Application for Building Permit and its bulletins give the Building Division's address as 1715 Chester Avenue, Bakersfield, CA 93301, with a phone number of 661-326-3720. Questions on electronic submittals go to DevBld@BakersfieldCity.us. The application form lists retaining wall, fence, re-roof, solar panels and pool/spa among its permit types, and says each structure or piece of work needs its own application.
The city runs more than one online system. Its Electronic Plan Review submittal guide for self-service applications sends you to an account on the city's Avolve site, where you pick the Self Service maintenance permit service, pay, print the permit and post it as the job card. The guide says a card payment adds a 2.5% convenience fee, and that you can request an inspection once Building Division staff have processed the request. The city has also published an Applicant Portal guide for its Clariti system, and its Development Center page has tabs for Electronic plan review, Self-Serve Maintenance Permit and Inspections. Ask the Building Division which system your permit goes through before you bid.
Sources6789
The city says every reroof needs a permit
Information Bulletin IB-1004 (revised 12/7/11) rescinded the city's old reroof bulletin from 1992. It says the city will no longer allow the exemption from a permit for reroofs under 30% of the roof area, and that all reroof projects must obtain a permit, following the current state code with local amendments. If you have been patching sections without one, that is the rule the city published.
The city also posts a reroof compliance sheet (revised 2/01/2016) with a Title 24 cool roof certificate and an attic vent calculation page. The vent form says it must be attached to the job card. Confirm the current forms and fees with the Building Division before you price a tear-off.
Sources1213
Pool gates: the bulletin inspectors work from
IB-1007, Swimming Pool Gates and Fence Requirements, sets the barrier rules. Fences and gates must be non-climbable and at least 5 feet (60 inches) tall, with latches and pull strings 60 inches clear of the ground or concrete. Pickets can have no more than 4 inches on center of horizontal space, rails need at least 45 inches of clear space between the top of the bottom rail and the top of the top rail, and the bottom of the pickets or rails can sit no more than 2 inches above grade. Gates into the pool area open away from the pool, and pet doors with direct access to a pool or spa are not allowed.
RV gates get their own rules. One side must be pinned into the concrete with the pin locked, and the other side self-closing and latching with the latch and pull string above 60 inches. Double walk-through gates are treated like RV gates. A gate or fence must also divide access to the pool from a secondary drive-through garage door. Price the gate hardware in from the start, and confirm the current bulletin with the Building Division.
Source11
Patio covers on the city's standard sheet
The Building Division's Patio Covers handout (revised 2/22/16) is marked for non-expansive soil only. If your lot is on expansive soil, ask the Building Division what it requires instead. Under the handout, a patio cover is an open, one-story structure no more than 12 feet high, used for recreation or outdoor living. It can't be used as a carport, garage, storage structure or habitable space. Headroom is at least 7 feet to the rafters and 6 feet 8 inches to a beam or header.
Rafters attached to existing fascia can span 12 feet at most. Posts are at least 4x4, footing concrete is at least 2,500 psi, and the plan package is two plot plans and two copies of the patio plan.
Source10