What goes into a deck estimate

Two decks with the same square footage can be priced very differently. These are the lines that move a deck estimate, and how to price each one so the homeowner's number holds up when you visit.

By the FullFlow team ·

Size, shape and levels

Square footage is the start, not the answer. Corners, angles and extra levels add framing and labor. A two-level deck with a landing is more work than a single rectangle of the same size.

Decking boards

Board choice is usually the biggest swing in price. Offering packages from a good option to a best option lets the homeowner pick their budget without you rewriting the quote.

Railing on the open sides

Railing is priced by the linear foot, and only where the deck is open. Sides against the house don't need it. Pricing railing on the full perimeter is one of the most common ways an online number comes out too high.

Stairs and height

Stairs are priced by the step, and a taller deck needs more of them and guards on the stairs. Height also changes the framing and footings underneath.

Add-ons

Picture-frame borders, lights, hot tub reinforcement, outdoor kitchens and pergolas are each their own line. Showing them as options lets the homeowner see what they add.

Permits, site and travel

Permit rules depend on where the house is, and some areas (such as the Lake Tahoe Basin) add their own review. Travel time from your shop is a real cost on every job outside town, so price it by the mile inside the area you serve.