Start with the Wildland-Urban Interface map
Santa Rosa's Wildland-Urban Interface (WUI) Fire Area dates from a 2009 map, and the city says all new construction inside it must meet Chapter 7A of the California Building Code, the state's ignition-resistant construction chapter. The fire department's address lookup tool shows whether a parcel is in. County parcels inside the city's WUI go to the County of Sonoma for requirements.
That line has moved. CAL FIRE's new Local Responsibility Area maps, released February 24, 2025, changed the Very High zones and added High zones in Santa Rosa. The city says that once they are adopted locally, new construction and certain renovations in those zones must meet WUI building standards, and sellers must provide a defensible space inspection (AB 38). The fire department then proposed redrawing the city's WUI boundary to match. The Press Democrat reported that the City Council approved the redrawn map 6-0 on May 12, 2026, adding about 3,100 properties, mostly in parts of Bennett Valley and Oakmont, and removing about 800. On every exterior bid near the old line, check the city's current map and ask the fire department whether the new boundary is in effect.
Sources34515
The fire rebuild standards have run out
The Resilient City Standards eased rebuilding in the fire areas: a possible Hillside Development exemption on slopes of 10% or more, the right to rebuild legally established structures that no longer meet current standards, and possible exemption from Design Review. For Tubbs and Nuns fire properties in Coffey Park, Fountaingrove and Hidden Valley, the city said they ran through December 31, 2025. For Glass fire properties in Piedmont Heights, Oakmont and Skyhawk, the date was October 28, 2026. Both dates have passed, so unless the city extended them, a late rebuild or addition in those areas should be checked against today's zoning before you quote it. Ask Planning.
Sources4613
Accela, appointments and entitlements first
Planning & Economic Development relaunched its Accela Citizen Access portal on July 6, 2026. It handles applications, plan uploads, status, inspection scheduling and payments, and some planning permit types now require online plan review. The city's permit page, in its spring 2026 version, listed residential re-roofs among simple trade permits auto-issued online to licensed contractors, so ask the Building Division whether that carried over to the new portal. In-person help at City Hall is by appointment at (707) 543-3200.
The Building Permits page says any required discretionary approval, like Design Review or a Conditional Use Permit, comes before the building permit application unless the Chief Building Official agrees to concurrent review.
Sources111214
Eight preservation districts
Santa Rosa's designated preservation districts are Burbank Gardens, Cherry Street, McDonald, Olive Park, Railroad Square, Ridgway, St. Rose and West End. Since March 28, 2025, the Design Review and Preservation Board reviews alterations there. Under the city's preservation chapter, exterior changes to landmarks and district properties need a Landmark Alteration Permit. Repainting previously painted surfaces is exempt, even with a color change, but painting previously unpainted brick or stone needs a Minor Landmark Alteration Permit. New decks and new fences or walkways are also listed for permit review, with a narrow exemption for fences and walkways that match the district's original era. Confirm the rule for the specific parcel with Planning before you bid.
Sources910