Step one: design review
The El Dorado Hills CSD says most villages need its Design Review Committee, or an HOA's Architectural Control Committee, to approve plans before any exterior improvement. Its application forms list decks, fencing, patio covers, retaining walls, exterior paint, roof replacement, siding, landscaping, tree removal, pools and solar. The District's Enforcement Authority Table shows whether a property is reviewed by the District or by its own HOA.
The DRC meets in person most Tuesdays at 8 a.m. A complete application is due by 5 p.m. the Tuesday before the meeting. The District emails the approved minutes to the owner or agent within 48 hours. Approvals expire after one year, and starting work before approval adds a $75 fee. The District says it is the owner's job to find out whether county approval is also required. Build a week or two for review into every timeline you promise.
Source3
Step two: the county permit
El Dorado County's Building Division issues permits for El Dorado Hills. Its main office is at 2850 Fairlane Court in Placerville, with walk-ins in the morning and appointments in the afternoon. Permits are filed through eTRAKiT, though the county's page says not all permit types are available there and that the portal is still having intermittent problems. Main line: (530) 621-5315. Inspections: (530) 621-5377.
The county's code enforcement FAQ answers two common questions. Fencing 7 feet high or less is exempt from a permit. Replacing a deck exactly as it was still needs one, because only limited non-structural, non-safety repairs are allowed without a permit. Zoning setbacks apply to every structure, permit or not. Confirm with the Building Division before you bid.
Sources12
Asbestos and dust rules on any dig
El Dorado County's Air Quality Management District says naturally occurring asbestos is found in serpentine and volcanic rock, and breaking that rock can release it into the air. The district's page says you need an Asbestos Dust Mitigation Plan if you disturb 20 or more cubic yards of soil inside its Asbestos Review Area. Another line on the same page says "more than 20," so ask the district about a borderline job. Outside that area, a project that needs a grading permit also needs a Fugitive Dust Plan. Check the county's Asbestos Review map for the parcel before you quote a pool dig or a long wall footing.
This is not theoretical here. In 2002, grading for soccer fields at Oak Ridge High School disturbed a vein of amphibole asbestos. The EPA's page says the agency planned a wider assessment of naturally occurring asbestos in El Dorado Hills.
Sources45